LG Innotek announced the Launch of Dream Factory

LG unveiled the Dream Factory, a hub for the production of FC-BGAs (Flip Chip Ball Grid Arrays), the company’s next-generation growth engine, to the media for the first time and announced it on the 30th April.

In 2022, LG Innotek announced its plans to launch a business producing FC-BGAs, high-value semiconductor substrates. To build the Dream Factory, the company acquired LG Electronics’ Gumi 4 Factory and began full-scale mass production in February 2024.

The Dream Factory, spanning a total area of 26,000 square meters, is regarded as the industry’s most advanced “smart” factory, integrating the latest IT technologies, including artificial intelligence, deep learning, robotics, and digital twin technologies. By applying automation, information, and intelligence technologies to the entire process, it has established a cutting-edge FC-BGA production infrastructure that eliminates the four major factors known to undermine production competitiveness: human error (Man), failure cost(F-cost), breakdown maintenance (BM) loss, and accidents.

Also Read: SharkNinja Appoints Kleona Mack as Shark Beauty™ Chief Marketing Officer

  • “Elimination of defects caused by human contact” through automation of all processes and logistics using robots
  • Unmanned AI-based FC-BGA quality inspection, enhancing customer confidence by ensuring quality “transparency”
  • Optimized FC-BGA process equipment using digital twin technology, “halving the ramp-up period”
  • Internalization of glass core technology, step-by-step entry into the high-end FC-BGA market: “Fostering the business into 700 million USD business by 2030″

Minseok Kang, vice president and head of LG Innotek’s Substrate & Material Business Unit, said, “LG Innotek will continue to expand the production of FC-BGAs that provide exceptional customer value based on its state-of-the-art Dream Factory and develop the FC-BGA business into 700 million USD business by 2030.”

SOURCE: PRNewswire

Subscribe Now

    Hot Topics